Aurora Lighting Brochure 2025

Case Studies by Vertical

CASE STUDIES AURORA ®

COMMERCIAL PRECISION

Office Complex, Belfast, Northern Ireland

Aurora Lighting was able to provide a wide range of technologically advanced lighting solutions that met the requirements of the project. The products offered great aesthetics and energy savings, with an impressive payback period.

• Slim-Fit ™ Downlights • BackLite ™ Flat Panels

The upgrades to the Aurora Lighting solutions have saved 10,988 Watts, and delivered 36,517.9 kWh of energy savings. The investment will pay for itself in just over two years (28.65 months). The contractor, Harvey Group, and the end user have both reported being very happy with the end result.

• Orbital ™ Bulkheads • UtiliteXL ™ Wall Packs • LinearPac ™ Anti-Corrosives • BatPac ™ Battens • EmPac ™ Exit Boxes, Blades & Spots

INDUSTRIAL FUNCTION

International Industrial End User, Lincoln, United Kingdom

Aurora was able to cut lighting bills by >50%, reducing operational maintenance costs by replacing ageing fittings, whilst delivering improved light quality, consistency and coverage throughout. A safer working environment for colleagues, whilst achieving return on investment in less than 2 years.

• BackLite ™ Flat Panels • LinearPac ™ Anti-Corrosives

Comprising manufacturing, warehousing and dispatch buildings, this heavy energy user had a lighting system that was on 24 hours a day. A wide variety of old fittings, technologies and lighting outputs throughout, left areas with poor and uneven lighting, posing health & safety risks to colleagues.

10

Made with FlippingBook - Online catalogs